RugShield is a pre-buy check for trading agents. Send a mint address and get back a 0–100 safety score, a verdict and the flags behind it: mint authority, freeze authority, holder concentration, LP lock and liquidity. Data comes from RugCheck, GoPlus and DexScreener.
RugShield detailsConnect in 30 seconds| Tool | What it returns | Cost |
|---|---|---|
scan_token | Safety score 0–100, verdict and flags for one Solana mint | 1 credit |
scan_tokens | Bulk: up to 20 mints per call, sorted safest-first | 1 credit / token |
trending_tokens | Latest boosted Solana tokens on DexScreener | 1 credit |
register_free_key | Mint an API key with 25 starter credits — no signup, email or card | free |
check_credits | Balance and call count for a key | free |
Credit packs: $9 = 1,000 · $29 = 10,000 · $99 = 100,000 credits. Credits never expire.
Output of scan_token({"mint_address": "EPjFWdd5AufqSSqeM2qN1xzybapC8G4wEGGkZwyTDt1v"}), captured from the live server on 2026-11-21:
{
"token": "EPjFWdd5AufqSSqeM2qN1xzybapC8G4wEGGkZwyTDt1v",
"safety_score": 20,
"verdict": "HIGH_RISK",
"flags": [
"MINTABLE - supply can be inflated (-40)",
"FREEZABLE - holdings can be frozen (-40)"
],
"market": {
"name": "USD Coin",
"symbol": "USDC",
"dex": "pancakeswap",
"price_usd": "0.9993",
"liquidity_usd": 2161960.59,
"volume_24h": 10857927.08,
"txns_24h": {
"buys": 105044,
"sells": 114127
},
"pair_age_hours": null,
"url": "https://dexscreener.com/solana/djntgubgeqiucwe8f981m2c3zghzt2xld8f2sqdz6rsz"
},
"security": {
"mintable": true,
"freezable": true,
"closable": false,
"balance_mutable": false,
"holder_count": "9604685",
"creator_count": 0
},
"holders": {
"top_holder_pct": null,
"top10_holder_pct": 0,
"lp_locked_pct": null,
"total_liquidity_usd": 0
},
"disclaimer": "Automated heuristic scan. Not financial advice. DYOR."
}
The example scans USDC, which comes back as HIGH_RISK because its issuer holds both mint and freeze authority. The score measures who can control the token on-chain. It is not a judgement of the issuer's reputation. Centralised stablecoins and many legitimate tokens keep these authorities, so agents should combine the flags with their own allow-lists.
This is an automated heuristic scan for information only. It is not financial advice and does not guarantee that a token is safe.
Endpoint: https://manhourplan.com/shield/mcp (Streamable HTTP; registry name com.manhourplan/rugshield).
Claude Code:
claude mcp add --transport http rugshield https://manhourplan.com/shield/mcp
Cursor (~/.cursor/mcp.json):
{
"mcpServers": {
"rugshield": {
"url": "https://manhourplan.com/shield/mcp"
}
}
}VS Code:
code --add-mcp '{"name":"rugshield","type":"http","url":"https://manhourplan.com/shield/mcp"}'Claude Desktop:
{
"mcpServers": {
"rugshield": {
"command": "npx",
"args": [
"-y",
"mcp-remote",
"https://manhourplan.com/shield/mcp"
]
}
}
}Raw JSON-RPC with curl:
U=https://manhourplan.com/shield/mcp
H='-H content-type:application/json -H accept:application/json,text/event-stream'
# 1) open a session
SID=$(curl -s -D - -o /dev/null $H -X POST $U -d '{"jsonrpc":"2.0","id":1,"method":"initialize","params":{"protocolVersion":"2025-03-26","capabilities":{},"clientInfo":{"name":"curl","version":"1"}}}' | grep -i '^mcp-session-id' | cut -d' ' -f2 | tr -d '\r')
curl -s $H -H "mcp-session-id: $SID" -X POST $U -d '{"jsonrpc":"2.0","method":"notifications/initialized"}' >/dev/null
# 2) mint a free key (25 credits, no signup)
curl -s $H -H "mcp-session-id: $SID" -X POST $U -d '{"jsonrpc":"2.0","id":2,"method":"tools/call","params":{"name":"register_free_key","arguments":{}}}'
# 3) call a tool with that key
curl -s $H -H "mcp-session-id: $SID" -X POST $U -d '{"jsonrpc":"2.0","id":3,"method":"tools/call","params":{"name":"scan_token","arguments":{"mint_address": "EPjFWdd5AufqSSqeM2qN1xzybapC8G4wEGGkZwyTDt1v", "api_key": "YOUR_KEY"}}}'
Start with the 25 free credits. When you need more, pay by card and the credits are added automatically:
$9 · 1,000 credits$29 · 10,000 credits$99 · 100,000 credits