0%
arming rug detector
RUGSHIELD
OPERATIONAL
TYPE mcp-server CHAIN solana BILLING credit-based UPSTREAM rugcheck · goplus · dexscreener
██████╗ ██╗   ██╗ ██████╗ ███████╗██╗  ██╗██╗███████╗██╗     ██████╗
██╔══██╗██║   ██║██╔════╝ ██╔════╝██║  ██║██║██╔════╝██║     ██╔══██╗
██████╔╝██║   ██║██║  ███╗███████╗███████║██║█████╗  ██║     ██║  ██║
██╔══██╗██║   ██║██║   ██║╚════██║██╔══██║██║██╔══╝  ██║     ██║  ██║
██║  ██║╚██████╔╝╚██████╔╝███████║██║  ██║██║███████╗███████╗██████╔╝
╚═╝  ╚═╝ ╚═════╝  ╚═════╝ ╚══════╝╚═╝  ╚═╝╚═╝╚══════╝╚══════╝╚═════╝

Rug-pull detection for AI trading agents.
Scan before you buy — every single time.

ENDPOINT https://manhourplan.com/shield/mcp FREE-TIER 25 credits · no card
[01]

Tools

6 METHODS · JSON-RPC 2.0
METHOD
POST /shield/mcp

scan_token

Full safety scan of any Solana mint: safety score 0–100, verdict, mint/freeze authority, holder concentration, LP lock, liquidity, pair age. The pre-buy check.

1 credit
METHOD
POST /shield/mcp

scan_tokens

Bulk pipeline — up to 20 mints per call, results sorted safest-first. Built for agents screening watchlists.

1 credit / token
METHOD
POST /shield/mcp

trending_tokens

Latest boosted Solana tokens on DexScreener — a discovery feed for agents hunting new launches. Pair it with scan_token.

1 credit
METHOD
POST /shield/mcp

register_free_key

Self-serve onboarding. Any agent mints its own API key with 25 starter credits. No signup, no email, no card.

free
METHOD
POST /shield/mcp

check_credits

Balance and lifetime call count for any API key.

free
[02]

Call it

WORKS WITH KIMI · CLAUDE · GPT · TRADING BOTS
// 1 · mint a free key register_free_key() // → { "api_key": "rs_9f2a…", "credits": 25 } // 2 · scan before you buy scan_token(mint_address = "DezXAZ8z…B263", api_key = "rs_9f2a…") { "safety_score": 23, "verdict": "HIGH_RISK", "flags": [ "MINTABLE - supply can be inflated (-40)", "LP not locked (-15)", "top holder owns 34.2% (-20)" ], "market": { "liquidity_usd": 4210.5, "pair_age_hours": 1.3 } }
[03]

Pricing

PAY-PER-CALL · NO SUBSCRIPTION
Scout
$0
25 credits · forever
  • self-serve key
  • all tools included
  • no card required
Trader
$9
1,000 credits
  • $0.009 per scan
  • credits never expire
  • crypto top-up
Desk
$99
100,000 credits
  • $0.00099 per scan
  • multi-key support
  • usage reports
[04]

Pay & Go

CRYPTO-NATIVE · SETTLED IN MINUTES
Network — Solana (SOL / USDC)
5ukK2Z4qF2MwNSCQpnBDCXuuiFatAC9wn9cWz41famqg
Network — USDT · TRC-20 (Tron)
TEqr1hfZssYCvMsK3gF27euaMqPzVmBBWx
01

Your agent runs out of credits — the error message returns this page and both wallet addresses.

02

Send $9 / $29 / $99 worth of SOL, USDC or USDT to either address. Keep the transaction hash.

03

Send your api_key + tx hash to the operator. Credits land on your key within minutes — settled on-chain, no invoicing.