MANHOURPLAN
For helicopter MRO & operations · Offshore · SAR · HEMS · Government fleets

Justify your headcount. Pass the audit.

ManHourPlan builds your Part-145 maintenance man-hour plan from fleet, utilisation and rotation data — and keeps it audit-ready with deviation alerts and quarterly reviews. Built for the operators flying AW139, AW169, AW189, H135, H145, S-92 and H175 in oil & gas, SAR and government service.

SUPPORTED TYPES  AW139 · AW169 · AW189 · H135 · H145 · S-92A · H175
Why this tool exists

Two regulations already demand what this tool produces.

EASA PART-145 · AMC1 145.A.30(d)

The man-hour plan obligation

Every Part-145 organisation must maintain a maintenance man-hour plan tied to its hangar visit plan, showing it has enough staff per function — planning, performing, supervising, certifying, compliance monitoring. A >25% man-hour shortfall in a calendar month is a "significant deviation" that must be reported internally, and the plan is expected to be reviewed every 3 months. Surveyors ask for this document. Most organisations produce a stale spreadsheet.

IOGP-690 · §25C — OFFSHORE HELICOPTER OPS

The oil-company audit standard

Operators flying offshore contracts are audited by energy majors against IOGP-690. For engineering staff it caps duty at 12 hours per 24, mandates 10-hour rest and 7 days off per month, and — point 25C.5 — requires a process defining required man-hours per maintenance task, linked to maintenance planning. Fail it and the contract conversation gets very short. ManHourPlan's rotation simulator validates your roster against these limits.

What it does

From fleet data to a defensible establishment, in minutes.

01

Workload forecast

Fleet × flight hours × check intervals → scheduled, line and defect man-hours per base. Type norms for AW139, AW169, AW189, H135, H145, S-92A and H175 — every coefficient editable.

02

Rotation simulator

Model 6/6, 2/4 (NCS), 4/4 or custom rotations per base. Validates coverage against IOGP-690 duty limits and flags single-person 24/7 shifts before an auditor does.

03

Deviation alerts

Enter the month's available man-hours — the 25% significant-deviation threshold is checked automatically, with the reporting obligation spelled out.

04

Function breakdown

Headcount split exactly the way 145.A.30(d) frames it: performing, certifying, supervision, planning and compliance monitoring — with certifying-staff ratios per base.

05

Auditor-ready PDF

One click exports fleet, assumptions, per-function establishment and deviation status as a clean document — for the surveyor, the accountable manager, or the budget fight.

06

Your data stays yours

The planner runs entirely in your browser. Fleet numbers, rosters and results are never uploaded — there is no server-side copy to leak.

Methodology

No black box. Every number is inspectable and editable.

  1. Workload: per aircraft type, intermediate and major check intervals (in flight hours) with planning man-hour norms, plus line man-hours per flight hour.
  2. Non-routine: a configurable defect-rectification allowance on top of scheduled workload (default 20%).
  3. Headcount: total man-hours ÷ productive hours per engineer (after leave, training, sickness, admin).
  4. Coverage: minimum manning × shifts × rotation factor per base — the requirement is whichever is larger, workload or coverage.
  5. Functions: supervision, planning and compliance monitoring added per Part-145 practice; certifying staff by configurable ratio.
  6. Deviation: monthly available vs planned man-hours, flagged at the 25% reportable threshold.
An honest tool. Shipped coefficients are published-industry planning estimates for offshore/SAR utilisation — clearly marked as such. For an authority submission you should calibrate them with your own maintenance history, which the tool makes a 5-minute job. ManHourPlan is an advisory planning tool: it supports, and does not replace, review by your compliance monitoring manager and competent authority.
Pricing

Start free. Upgrade when the audit letter arrives.

Calculator — Free
$0
  • Full workload & headcount engine
  • All 7 aircraft types
  • 1 base · up to 5 aircraft
  • Deviation threshold check
  • Runs in your browser — no signup
Open free calculator
Planner
$99/mo
For a single-base MRO or small operator
  • Everything in Free
  • Auditor-ready PDF report (145.A.30(d) evidence)
  • Saved scenarios & what-if compare
  • Quarterly review workflow
  • Up to 3 bases and 15 aircraft
  • 1 user · email support (48h)
Get Planner — $99/mo
Operator
$249/mo
For multi-base groups, CAMOs & fleets with rotations
  • Everything in Planner
  • Unlimited bases and aircraft — group-wide establishment
  • CSV export for finance / HR systems
  • IOGP-690 §25C evidence pack for oil & gas customer audits
  • Up to 5 users · priority support (12h) from an active type instructor
  • Annual methodology review call
Get Operator — $249/mo

Cancel anytime in one click from your Stripe receipt — you keep access until the end of the paid month, no questions, no lock-in. Your scenarios stay saved in your browser even after cancellation; only PDF export, saving and plan caps return to Free tier.

FAQ

Straight answers.

Does my fleet data get uploaded anywhere?

No. The planner is a client-side application: all computation happens in your browser, and saved scenarios live in your browser's local storage. We never see your fleet, your rosters or your results.

Are the aircraft man-hour figures OEM data?

No — they are industry planning estimates assembled from published maintenance-planning practice for each type, and they are clearly labelled as such. Every coefficient is editable; for a formal authority submission, calibrate with your own records (the coefficients panel is built for exactly that).

Is this a substitute for regulatory compliance?

No. It is an advisory planning tool that produces the analysis and documents your compliance monitoring manager needs. Final sign-off always belongs to your organisation's accountable manager and competent authority.

Which operations is it built for?

Helicopter MRO and operations first — offshore oil & gas, SAR, HEMS and government fleets on AW139, AW169, AW189, H135, H145, S-92A and H175. The engine is type-agnostic; fixed-wing and additional types can be added via the coefficients panel.

Can I get an invoice and pay by card?

Yes — card payment with automatic Stripe invoicing is live, and crypto (SOL, USDT-TRC20) is also accepted. Email smartlivingcircle@gmail.com if you need a formal quote first.

Who built this

Built by someone who's staffed the hangar.

AW

ManHourPlan is built by an active AW139 / AW189 type instructor working with MTO and MRO operations across oil & gas, SAR and government fleets — the person who watches manpower spreadsheets fall apart before audits and decided to fix it properly. The methodology follows published maintenance manpower research and the regulatory frameworks (EASA Part-145, IOGP-690) your surveyors and customers actually use. Feature requests and methodology challenges are welcome: smartlivingcircle@gmail.com.