ManHourPlan
AboutCalculatorBlog
Consulting & Done-For-You Services

Need the man-hour plan itself — not just the tool?
I'll build it for you.

Fixed-price, auditor-ready deliverables from an active AW139 / AW189 type instructor working in MRO operations. You send fleet and roster data — you receive a defensible document your quality manager and surveyor can sign off.

MOST REQUESTED

Part-145 Man-Hour Plan — prepared for you (AMC1 145.A.30(d))

A complete, defensible maintenance man-hour plan built from your fleet, utilisation, base structure and rotation data — workload-driven and coverage-driven demand, deviation analysis, and the assumptions register auditors ask for.

  • Worked through with you on one 60-min call, delivered in 5 working days
  • Includes the model file (built on the ManHourPlan engine) so you can re-run it quarterly
  • One revision round included after your quality review
US$490per plan (up to 3 bases / 15 aircraft)FIXED PRICE
Request this service →
Larger fleets or multi-entity approvals: ask for a same-day quote.
OFFSHORE / OIL & GAS

IOGP-690 Offshore Manning Review

An independent review of your offshore manning against IOGP-690 duty and rest guidance — rotation modelling (6/6, 2/4 NCS, 4/4 or custom), coverage gap analysis, and single-person 24/7 shift flags before your customer's aviation adviser finds them.

  • Written report with pass / flag per base and recommended establishment
  • Rotation simulator output included
  • Delivered in 3 working days
US$390per baseFIXED PRICE
Request this service →
TYPE TRAINING

AW139 / AW189 B1 & B2 support — remote sessions

One-to-one remote sessions with an active type instructor: exam preparation, systems deep-dives, maintenance practice walk-throughs, or pre-assessment warm-ups for engineers joining AW139/AW189 fleets.

US$95per hour (video call, materials included)
Book a session →

How it works

1

Email support@manhourplan.com with the service and your fleet basics (the buttons above pre-fill the message).

2

You receive a same-day reply with scope confirmation and a Stripe payment link (card, Apple Pay, Google Pay).

3

Delivery in 3–5 working days with a revision round included. If I can't take the work, I tell you within 24 hours and you pay nothing.

Who delivers this: an active AW139 / AW189 type instructor working with MTO and MRO operations across oil & gas, SAR and government fleets — and the builder of the ManHourPlan calculator used on this site. The methodology follows EASA Part-145 (AMC1 145.A.30(d)) and IOGP-690 — the frameworks your surveyors and customers actually use.

Advisory services only — the operator/AMO remains responsible for regulatory compliance and formal approval of any submitted document. ManHourPlan is an advisory planning tool, not a substitute for compliance review.