Agents that build lead lists or handle signups need to know whether an address can receive mail. VerifAI checks syntax, flags disposable domains, looks up MX records and returns a deliverability score. Its domain_intel tool returns DNS, RDAP registration and SSL data for the domain.
| Tool | What it returns | Cost |
|---|---|---|
verify_email | Syntax, disposable-domain (16-provider list) and MX checks, deliverability score 0–100 | 1 credit |
verify_emails | Bulk: up to 50 addresses per call | 1 credit / address |
domain_intel | DNS (A/AAAA/MX/NS/TXT), RDAP registration data, SSL days remaining | 1 credit |
register_free_key | Mint an API key with 25 starter credits — no signup, email or card | free |
check_credits | Balance and call count for a key | free |
Credit packs: $9 = 1,000 · $29 = 10,000 · $99 = 100,000 credits. Credits never expire.
Output of verify_email({"email": "support@manhourplan.com"}), captured from the live server on 2026-11-21:
{
"email": "support@manhourplan.com",
"score": 100,
"deliverable": true,
"checks": {
"syntax": true,
"disposable": false,
"mx_records": [
"10 mx1.improvmx.com",
"20 mx2.improvmx.com"
],
"has_mx": true
},
"reason": "ok"
}
VerifAI does not open an SMTP connection to the mailbox. A score of 100 means the address is well-formed, not disposable, and its domain accepts mail. It does not prove that the mailbox exists.
Endpoint: https://manhourplan.com/mcp (Streamable HTTP; registry name com.manhourplan/verifai).
Claude Code:
claude mcp add --transport http verifai https://manhourplan.com/mcp
Cursor (~/.cursor/mcp.json):
{
"mcpServers": {
"verifai": {
"url": "https://manhourplan.com/mcp"
}
}
}VS Code:
code --add-mcp '{"name":"verifai","type":"http","url":"https://manhourplan.com/mcp"}'Claude Desktop:
{
"mcpServers": {
"verifai": {
"command": "npx",
"args": [
"-y",
"mcp-remote",
"https://manhourplan.com/mcp"
]
}
}
}Raw JSON-RPC with curl:
U=https://manhourplan.com/mcp
H='-H content-type:application/json -H accept:application/json,text/event-stream'
# 1) open a session
SID=$(curl -s -D - -o /dev/null $H -X POST $U -d '{"jsonrpc":"2.0","id":1,"method":"initialize","params":{"protocolVersion":"2025-03-26","capabilities":{},"clientInfo":{"name":"curl","version":"1"}}}' | grep -i '^mcp-session-id' | cut -d' ' -f2 | tr -d '\r')
curl -s $H -H "mcp-session-id: $SID" -X POST $U -d '{"jsonrpc":"2.0","method":"notifications/initialized"}' >/dev/null
# 2) mint a free key (25 credits, no signup)
curl -s $H -H "mcp-session-id: $SID" -X POST $U -d '{"jsonrpc":"2.0","id":2,"method":"tools/call","params":{"name":"register_free_key","arguments":{}}}'
# 3) call a tool with that key
curl -s $H -H "mcp-session-id: $SID" -X POST $U -d '{"jsonrpc":"2.0","id":3,"method":"tools/call","params":{"name":"verify_email","arguments":{"email": "support@manhourplan.com", "api_key": "YOUR_KEY"}}}'
Start with the 25 free credits. When you need more, pay by card and the credits are added automatically:
$9 · 1,000 credits$29 · 10,000 credits$99 · 100,000 credits