{
    "protocolVersion": "0.3.0",
    "name": "PageMD",
    "description": "PageMD turns public web pages into clean Markdown for LLMs and returns page links/metadata, domain intel (DNS + RDAP), an HTTP security headers score and a heuristic prompt-injection check. Send a message containing a URL (optionally with a word like 'links', 'headers', 'injection' or 'domain'). A2A calls use the shared free trial (5 calls per IP per UTC day); after that each call is paid per request with x402 (USDC on Base or Solana, $0.001-$0.002) at the HTTP endpoint named in the reply. Respects robots.txt; static HTML only.",
    "url": "https://manhourplan.com/pagemd/a2a",
    "preferredTransport": "JSONRPC",
    "additionalInterfaces": [
        {
            "url": "https://manhourplan.com/pagemd/a2a",
            "transport": "JSONRPC"
        },
        {
            "url": "https://pagemd-x402.m-zikriz.workers.dev/a2a",
            "transport": "JSONRPC"
        }
    ],
    "iconUrl": "https://manhourplan.com/pagemd/icon.png",
    "provider": {
        "organization": "ManHourPlan",
        "url": "https://manhourplan.com"
    },
    "version": "1.3.0",
    "documentationUrl": "https://manhourplan.com/pagemd/",
    "capabilities": {
        "streaming": false,
        "pushNotifications": false,
        "stateTransitionHistory": false
    },
    "defaultInputModes": [
        "text/plain"
    ],
    "defaultOutputModes": [
        "text/markdown",
        "application/json"
    ],
    "skills": [
        {
            "id": "read_url",
            "name": "Read URL as Markdown",
            "description": "Read a public web page as clean Markdown for LLMs: title, description, canonical URL, main content as Markdown, word count and prompt-injection flags. Respects robots.txt; not charged if the page cannot be read. Paid: $0.001 USDC per call via x402 at https://manhourplan.com/pagemd/v1/read (also https://pagemd-x402.m-zikriz.workers.dev/v1/read).",
            "tags": [
                "web-scraping",
                "markdown",
                "llm-ready",
                "web-extraction"
            ],
            "examples": [
                "Read https://example.com",
                "Convert https://en.wikipedia.org/wiki/HTTP_402 to markdown"
            ],
            "inputModes": [
                "text/plain"
            ],
            "outputModes": [
                "text/markdown",
                "application/json"
            ]
        },
        {
            "id": "page_links",
            "name": "Page links and metadata",
            "description": "Page metadata and links: title, description, canonical, OpenGraph image, language, RSS/Atom feeds, plus every internal and external link with its anchor text. Respects robots.txt; not charged on failure. Paid: $0.001 USDC per call via x402 at https://manhourplan.com/pagemd/v1/links (also https://pagemd-x402.m-zikriz.workers.dev/v1/links).",
            "tags": [
                "links",
                "metadata",
                "rss",
                "web-extraction"
            ],
            "examples": [
                "links https://blog.cloudflare.com/"
            ],
            "inputModes": [
                "text/plain"
            ],
            "outputModes": [
                "text/markdown",
                "application/json"
            ]
        },
        {
            "id": "domain_intel",
            "name": "Domain intel (DNS + RDAP)",
            "description": "Domain intel in one call: DNS A, AAAA, MX, NS, TXT, CNAME and CAA records, SPF and DMARC policy, plus RDAP registrar, creation and expiry dates, age in days and status codes. Paid: $0.002 USDC per call via x402 at https://manhourplan.com/pagemd/v1/domain (also https://pagemd-x402.m-zikriz.workers.dev/v1/domain).",
            "tags": [
                "dns",
                "rdap",
                "whois",
                "domain-intelligence"
            ],
            "examples": [
                "domain https://manhourplan.com"
            ],
            "inputModes": [
                "text/plain"
            ],
            "outputModes": [
                "text/markdown",
                "application/json"
            ]
        },
        {
            "id": "security_headers",
            "name": "Security headers check",
            "description": "Security headers check for a public URL: fetches it and reports HSTS, Content-Security-Policy, X-Frame-Options, X-Content-Type-Options, Referrer-Policy, Permissions-Policy, COOP/CORP/COEP and cookie flags, with a 0-100 score, grade and concrete fixes. Not charged if the site cannot be reached. Paid: $0.001 USDC per call via x402 at https://manhourplan.com/pagemd/v1/headers (also https://pagemd-x402.m-zikriz.workers.dev/v1/headers).",
            "tags": [
                "security",
                "http-headers",
                "hsts",
                "csp"
            ],
            "examples": [
                "headers https://manhourplan.com/"
            ],
            "inputModes": [
                "text/plain"
            ],
            "outputModes": [
                "text/markdown",
                "application/json"
            ]
        },
        {
            "id": "prompt_injection_check",
            "name": "Prompt-injection check",
            "description": "Prompt-injection risk check for agents: GET ?url= scans a public page (visible and hidden text, comments, attributes, meta, JSON-LD) or POST JSON {\"text\"} (max 50 KB) scans raw text. Flags instruction overrides, role/system-prompt spoofing, secret exfiltration asks, tool-call coercion, hidden or unicode-smuggled text, base64 instructions and markdown image exfil links. Returns a 0-100 risk score, low/medium/high verdict and findings. Heuristic; not charged on failure. Paid: $0.002 USDC per call via x402 at https://manhourplan.com/pagemd/v1/injection (also https://pagemd-x402.m-zikriz.workers.dev/v1/injection).",
            "tags": [
                "security",
                "prompt-injection",
                "ai-safety"
            ],
            "examples": [
                "injection https://example.com/"
            ],
            "inputModes": [
                "text/plain"
            ],
            "outputModes": [
                "text/markdown",
                "application/json"
            ]
        }
    ],
    "supportsAuthenticatedExtendedCard": false
}
